Individual · Advisors · InstitutionsLog InOpen Account
繁中 / EN
Interactive Brokers
Contact

About / Corrections

Corrections policy

Pages age and pages get things wrong. A correction records what changed, when and on what basis; it does not erase the trail.

CORRECTION LOG
01 Report→02 Verify→03 Correct→04 Log

5 reports · 3 corrected · 2 days to first reply

01 · Scope

What this page covers

  • Verify before changing anything.
  • Keep every change traceable to a date and source.
  • Bigger mistakes get faster responses.

02 · Severity

Four severity levels

Two questions set the level: could the error change a decision, and can it be checked against official material? A reporter may ask for one review.

LevelDefinitionTypical exampleFirst replyCorrection
S1 Material factChanges an opening, funding or tax decisionCommission, entity, tax deadline1 business day2 business days
S2 Fact or numberMisleads a calculationFX example, fee threshold2 business days5 business days
S3 Out of dateWas correct; the source changedOld fee schedule, retired feature5 business days10 business days
S4 Text or formatPresentation onlyTypo, punctuation, broken table5 business daysNext routine update
S1 never waits: one funding or fee number is treated at the top level.

03 · Reporting

How to report an error

A good report pairs the current text, the correct text and the basis. Never send an account number, ID or position screenshot.

FieldWhat to writeExample
Page and sectionPath plus heading or tableCorrections page, timing table
Quoted textThe exact sentence"Corrections finish within 30 days"
Your versionThe wording and number you believe"S1 is 2 business days"
BasisOfficial document or screenshotNovember 2026 fee schedule, p.3
ImpactWhich decision it distortsCould misjudge funding time
Reply routeEmail or form; credit or notEmail, no name published

Split errors into items, attach original files, and name each document's version. We acknowledge in two business days with a log number.

04 · Timelines

From inbox to public log

Targets are business days, excluding Hong Kong holidays. Complex cases get a reason and a date.

StageTargetWhat you receiveNote
Acknowledge2 business daysLog number and severityAuto-reply is not enough
Triage3 business daysAccepted, or what is missingIncomplete reports pause
CorrectS1 two days / S2 fiveChanged passage and datePage first, log second
Publish log7 business daysEntry and summarySame day or later
Close10 business daysFinding, reason, reviewOne further review

If a target passes without a reply, chase the same entry.

05 · Worked example

5 reports, 3 corrected, 2 days

Five reports arrive in early November about transfer fees. One is a duplicate, one an opinion dispute, three the same error: USD 100 per side instead of USD 10.

IDReceivedTypeFindingActionDone
R-013 NovFee numberUpheld, S2Correct table5 Nov
R-023 NovDuplicateMerged into R-01Merged reply5 Nov
R-034 NovOpinion disputeNot upheldExplain, no rewrite5 Nov
R-045 NovFee number, screenshotUpheld, S1Escalate and correct6 Nov
R-056 NovDead linkUpheld, S4Fix link6 Nov

06 · Log format

What the public log looks like

Readers should judge the impact without the old page: eight fixed fields, in order.

FieldContentExample
Log IDYear and running numberCOR-2026-014
PublishedFirst public date2026-11-05
PagePath and sectionFees page, transfer table
BeforeThe old sentence or numberUSD 100 per side
AfterThe corrected textUSD 10 per side
LevelS1 to S4S2
BasisSource and versionNovember 2026 fee schedule
ImpactWhat to re-readTransfer cost falls 90%

Entries are never deleted, only extended; a second instance gets a new entry with a related line.

07 · Boundaries

What we do not correct

Not every disagreement is an error. These categories stay, with a reason and a note.

TypeWhy it staysWhat we do
Opinion and analysisA judgement, not a factNote the other view
Third-party materialThe original is not oursShow the source and date
Labelled estimatesUncertainty is statedUpdate if better data appears
Translation styleWord choice is not a factFix meaning-changing errors
Layout preferenceNo effect on factsRoutine update
Legal adviceWe give no personal advicePoint to a professional
Retired pagesRemoved to avoid misleadingKeep a 12-month archive

If unsure, report it anyway; triage may end with no change, with a note.

08 · Record

What a correction leaves behind

The old version is not deleted. Material corrections show a last-corrected date; the log keeps before, after, level and basis. Archives last 12 months.

We do not tidy the log, and the same error reported twice in three months is tagged a repeat miss.

09 · Related

How this fits other policies

If a report involves personal data, privacy is handled before the public log.

10 · Sources

Sources and check month

SourceUsed forChecked
IBKR fee schedulesFees2026-11
IBKR client agreementsEntity and terms2026-11
IBKR tax documentsDeadlines, forms2026-11
SEC investor bulletinsUS retail2026-11
UK FCA HandbookComplaints, disclosure2026-11
Hong Kong SFC materialLicensed activity2026-11
Editorial standardsSeverity, log format2026-11
Research methodSource checking2026-11

FAQ · 8 questions

Frequently asked questions

Do I need an account?

No. Send the page, quoted text, your version and the basis; never account details.

How fast is the first reply?

Two business days with a log number.

Will my name be public?

No by default; only with your consent.

Why are some reports rejected?

Duplicates, opinion and unverifiable rumours do not change the text.

Does the old version disappear?

No. Archives last 12 months; the log keeps both.

Is a translation error factual?

Only if it changes a number, condition or duty; style edits get no entry.

Can an article be removed?

You can ask; removals are separate and logged.

Do corrections affect rankings or revenue?

No. Coverage is not sold; no commercial arrangement changes.